LAHomework Sign in
Los Angeles, CA 90047 · W 88th St

1412 W 88th St

Built 1931 · 1,190 sq ft
LOT 4,677 SQ FT · 2 STRUCTURES · APN 6037-017-012Lot Structure
1 item worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1931
Living area
1,190 sqft
Lot size
4,677 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
3
Bathrooms
2
Home type
Single-family
Parcel (APN)
6037-017-012

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

1 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACOn record 2021
Expected 2036 to 2041From the 2021 permit
Water heaterOn record 2020
Expected 2030 to 2035From the 2020 permit
20262035

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 36 homes on W 88th St →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2026
    permit on fileElectrical: Install An Electrical Vehicle Charger(S) In A Single-Family Dwelling.
  • 2024
    permit on fileGeneral remodel: Add Sill Plate Anchor Bolts And Plywood To Cripple Walls (If Existing) Per La City Standard Plan #1; No Foundation Replacement (Earthquake Hazard Reduction Per Chapter 92 Of The Los Angeles Building Code). (Houses, Residential Buildings Up To 3 Stories And Up To 4 Units).
  • 2021
    permit on fileElectrical: Electrical Panel Upgrade To 200 Amp.New Hvac Installation, New Condenser And Furnace.
  • 2021
    permit on fileHeating & cooling: Install New Ac Condenser And A New Furnace.
  • 2020
    permit on fileKitchen: (1) Kitchen/ (1) Bathroom Remodel For Residential Buildings (No Structural Changes). (17) Window And (3) Door Change-Out (Same Size & Type) For Residential Buildings. Dual Glazing, Labeled And Certified By National Fenestration Rating Council (Nfrc), Is Required For Doors And Windows Replaced In All
  • 2020
    permit on fileKitchen: Interior Remodel Bath And Kitchen, Add New Bath And Convert Den Into Bedroom. All Within Existing Space. All Work Per Wood Frame Prescriptive Provisions
  • 2020
    permit on fileElectrical: Install (54) Lights/Outlets/Switches And (2) Smoke Detectors
  • 2020
    permit on fileWater heater: Install (2) Gas Outlets And (1) Earthquake Valve-Water Heater & Ventr/R: (1) Garbage Disposal-Bathtub-Kitchen Sink-Toilet

Manage this home to schedule a service or to update the timeline.

Coming up
  • 2030
    Water heater replacementExpected 2030 to 2035