LAHomework Sign in
Glendale, CA 91202 · Bruce Ave

1408 Bruce Ave

Built 1936 · 1,904 sq ft
LOT 6,638 SQ FT · 2 STRUCTURES · APN 5628-005-029Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1936
Living area
1,904 sqft
Lot size
6,638 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
3
Bathrooms
2
Home type
Single-family
Parcel (APN)
5628-005-029

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofOn record 2025
Expected 2045 to 2055From the 2025 permit
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 88 homes on Bruce Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2025
    permit on fileRoof: Re-Roofing Of Existing Roof To The Same Roof Material And Color. Drb Has Approved It.
  • 2025
    permit on fileSolar: Installation Of An Ess System 38.4Kwh Or Less And/Or Flush Roof Mounted Photovoltaic System On A Residential Single-Family Dwelling, Including Adus, 38Kw Or Less. This Installation Shall Comply With The Electrical, Fire And Building Provisions Of The Most Recent Applicable Code Cycle.
  • 2001
    permit on fileRoof: Material: 25 Yr Comp Shingle - No. Of Squares8 - Tear Of Existing (Y/N):Y - Existing No. Of Layers:3 - New Sheathing (Y/N):Y 1/2" Cdx With 8D, 6",12" - Note: All Tear-Offs Require Solid Sheathing. Install Min. 3/8" Structural Wood Panel With 6D Common Nails At 6:12. This May Be Installed Over Existi
  • 2001
    permit on fileRoof: Material: 25 Yr Comp Shingle - No. Of Squares:24 - Tear Of Existing (Y/N):Y - Existing No. Of Layers:3 - New Sheathing (Y/N):Y 1/2" Cdx With 8D, 6", 12" - Note: All Tear-Offs Require Solid Sheathing. Install Min. 3/8" Structural Wood Panel With 6D Common Nails At 6:12. This May Be Installed Over Exi

Manage this home to schedule a service or to update the timeline.