LAHomework Sign in
Pasadena, CA 91103 · Sunset Ave

1384 Sunset Ave

Built 1925 · 816 sq ft
LOT 3,620 SQ FT · 2 STRUCTURES · APN 5728-016-040Lot Structure
2 items worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1925
Living area
816 sqft
Lot size
3,620 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
2
Bathrooms
1
Home type
Single-family
Parcel (APN)
5728-016-040

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

2 worth planning for · 0 to confirm. Open "How we estimate this" on any card.
RoofOn record 2017
Expected 2037 to 2047From the 2017 permit
HVACOn record 2001
Usually done by 2021From the 2001 permit
Water heaterOn record 2017
Expected 2027 to 2032From the 2017 permit
20262035

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 117 homes on Sunset Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2017
    permit on fileRoof: Reroof Existing House Only Install With 30 Yrs Cool Roof Energy Efficient Shingles Title 24 Compliant; (Repair 1X6 As Needed.) @ 12 Sq
  • 2017
    permit on filePlumbing: Repipe And Redrain Entire House; Replace Plumbing Fixures.
  • 2017
    permit on fileElectrical: Electrical For (1 200 Amp Sub-Panel And For Re-Wiring Of Interior Home - No Remodel
  • 2017
    permit on fileWater heater: Legalization For Water Heater Replacement
  • 2009
    permit on file, unconfirmedGeneral remodel: Historic Building Diagram
  • 2001
    permit on fileHeating & cooling: Fau Changeout

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    HVAC replacementUsually done by 2021
  • 2027
    Water heater replacementExpected 2027 to 2032