LAHomework Sign in
Pasadena, CA 91104 · Sinaloa Ave

1384 Sinaloa Ave

Built 1925 · 2,100 sq ft
LOT 7,585 SQ FT · 2 STRUCTURES · APN 5851-024-010Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1925
Living area
2,100 sqft
Lot size
7,585 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
5
Bathrooms
2
Home type
Single-family
Parcel (APN)
5851-024-010

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACOn record 2024
Expected 2039 to 2044From the 2024 permit
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 107 homes on Sinaloa Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2026
    permit on file, unconfirmedRoom addition: Convert 770 Sf Of (E) Main Dwelling Unit To Adu
  • 2026
    permit on file, unconfirmedHeating & cooling: Mechanical For: Convert 770 Sf Of (E) Main Dwelling Unit To Adu
  • 2024
    permit on filePlumbing: Plumbing For (N) 1141 Sf Two Story Detached Adu (Two Bedrooms, Two Bathrooms, And One Powder Room) With Unpermitted 312 Sf Carport To Be Demolished - Adu'S New Plumbing. Adu'S Water, Sewer, And Gas Connections To The Main House'S Main Lines
  • 2024
    permit on filePlumbing: Connect New Two Story Detached Adu To Existing Sewer Lateral.
  • 2024
    permit on fileElectrical: Electrical For (N) 1141 Sf Two Story Detached Adu (Two Bedrooms, Two Bathrooms, And One Powder Room) With Unpermitted 312 Sf Carport To Be Demolished
  • 2024
    permit on fileHeating & cooling: New Installation Of A Heat Pump Split System W/ Duct Work.
  • 2024
    permit on fileElectrical: Relocated 200 Amp Meter
  • 2022
    permit on fileElectrical: Upgrade Main Panel To 200Amp

Manage this home to schedule a service or to update the timeline.