LAHomework Sign in
Beverly Hills, CA 90211 · N Hamel Dr

137 N Hamel Dr

Built 1923 · 1,841 sq ft
LOT 6,470 SQ FT · 2 STRUCTURES · APN 4334-010-059Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1923
Living area
1,841 sqft
Lot size
6,470 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
4
Bathrooms
2
Home type
Single-family
Parcel (APN)
4334-010-059

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 3 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 31 homes on N Hamel Dr →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2024
    permit on file, unconfirmedKitchen: Ext & Interior Remodel Paint Ext Of House Replace Flooring, Kitchen & Bathroom Fixtures Cabinets Appliances (No Layout Change) Exhaust Fans For Kitchen & Bathrooms Req To Comply W/2022 Cmca(Cp2400399) **Owner Builder**
  • 2024
    permit on file, unconfirmedElectrical: Ext & Interior Remodel Paint Ext Of House Replace Flooring, Kitchen & Bathroom Fixtures Cabinets Appliances (No Layout Change) Exhaust Fans For Kitchen & Bathrooms Req To Comply W/2022 Cmca(Cp2400399)
  • 2024
    permit on file, unconfirmedHeating & cooling: Ext & Interior Remodel Paint Ext Of House Replace Flooring, Kitchen & Bathroom Fixtures Cabinets Appliances (No Layout Change) Exhaust Fans For Kitchen & Bathrooms Req To Comply W/2022 Cmca(Cp2400399)
  • 2024
    permit on file, unconfirmedPlumbing: Ext & Interior Remodel Paint Ext Of House Replace Flooring, Kitchen & Bathroom Fixtures Cabinets Appliances (No Layout Change) Exhaust Fans For Kitchen & Bathrooms Req To Comply W/2022 Cmca(Cp2400399)
  • 2024
    permit on file, unconfirmedElectrical: Main Service Panel Upgrade To 200 Amps
  • 2024
    permit on file, unconfirmedRoom addition: Int Remodel Of Adu Replace Kitchen & Bathroom Fixtures Finishes Appliances Exhaust Fans In Kitchen & Bath Req No Layout Change (90 Day Permit, Cp2400399) **Owner Builder**
  • 2024
    permit on file, unconfirmedElectrical: Int Remodel Of Adu Replace Kitchen & Bathroom Fixtures Finishes Appliances Exhaust Fans In Kitchen & Bath Req No Layout Change (90 Day Permit, Cp2400399)
  • 2024
    permit on file, unconfirmedHeating & cooling: Int Remodel Of Adu Replace Kitchen & Bathroom Fixtures Finishes Appliances Exhaust Fans In Kitchen & Bath Req No Layout Change (90 Day Permit, Cp2400399)
  • 2024
    permit on file, unconfirmedPlumbing: Int Remodel Of Adu Replace Kitchen & Bathroom Fixtures Finishes Appliances Exhaust Fans In Kitchen & Bath Req No Layout Change (90 Day Permit, Cp2400399)
  • 2024
    permit on file, unconfirmedElectrical: New Sub-Panel For Adu- 80 Amps
  • 2022
    permit on file, unconfirmedRoof: Remove Existing Roof From Main House Install Torch Down Flat Roof
  • 2022
    permit on file, unconfirmedRoof: Remove Existing Roof From Garage Install Torch Down Flat Roof

Manage this home to schedule a service or to update the timeline.