LAHomework Sign in
Whittier, CA 90605 · Lukay St

13678 Lukay St

Built 1953 · 878 sq ft
LOT 5,717 SQ FT · 2 STRUCTURES · APN 8030-031-036Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1953
Living area
878 sqft
Lot size
5,717 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
3
Bathrooms
1
Home type
Single-family
Parcel (APN)
8030-031-036

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACOn record 2022
Expected 2037 to 2042From the 2022 permit
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 35 homes on Lukay St →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2022
    permit on fileKitchen: Kitchen Fire Restoration W/ Minor Smoke Damage: (No Structural Damage), Kitchen Will Be Stripped Down To The Framing, New Insulation, New Drywall, Remove And Replace Damaged Window (Same Size), New Cabinets, Replace Flooring In Kitchen And Living Room And Clean & Paint Entire House.
  • 2022
    permit on fileElectrical: Kitchen Fire Restoration: Complete Kitchen Will Be Rewired Along With Replacement Of Breaker, Replace 10 Receptacle Outlets, Replace 3 Light Switches And Replace 2 Light Fixtures, (Existing Main Service Panel Requiring Utility Release)
  • 2022
    permit on filePlumbing: Kitchen Fire Restoration: Minor Damage Done, Kitchen To Be Gutted, No Rough Plumbing Damaged, So All Plumbing Fixtures Only To Be Replaced, Garbage Disposal, Kitchen Sink And Faucet.
  • 2022
    permit on fileElectrical: Temporary Power Pole For Work On Fire Damage Restoration House. 200 Amp Panel To Be Used.
  • 2022
    permit on fileHeating & cooling: Fire Restoration Project: Decided To Replace Existing Wall Heater; Double Sided 50,000 Btu'S
  • 2022
    permit on fileElectrical: Throughout House Install... 12 Recessed Lighting With Switches And 4 Smoke Detectors (Hard Wired)
  • 2022
    permit on filePlumbing: Kitchen: Run A 1/2" Copper Water Line To Refrigerator For Ice Maker. Bathroom: Repipe Both Hot And Cold-Water Lines With 1/2" Copper, Replace Shower Tub/Toilet/Vanity Sink, And All Plumbing Fixtures
  • 2022
    permit on fileHeating & cooling: Kitchen: Install Ducting And Range Vent Hood, Bathroom: Install Ducting And Ceiling Exhaust Fan

Manage this home to schedule a service or to update the timeline.