LAHomework Sign in
Beverly Hills, CA 90211 · N Hamilton Dr

135 N Hamilton Dr

Built 1928 · 4,484 sq ft
LOT 6,474 SQ FT · 1 STRUCTURE · APN 4334-021-069Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1928
Living area
4,484 sqft
Lot size
6,474 sqft
Structures on lot
1
Bedrooms
7
Bathrooms
6
Home type
Fourplex (4 units)
Parcel (APN)
4334-021-069

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 3 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 61 homes on N Hamilton Dr →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2025
    permit on file, unconfirmedRoom addition: (Eplan) Convert Existing Garage And Storage To Adu In An Existing 2 Story Building (Inlcudes Plans For Soft Story Retrofit Under Separate Permit Bs2001120)
  • 2025
    permit on file, unconfirmedElectrical: Convert Existing Garage And Storage To Adu In An Existing 2 Story Building
  • 2025
    permit on file, unconfirmedHeating & cooling: Convert Existing Garage And Storage To Adu In An Existing 2 Story Building
  • 2025
    permit on file, unconfirmedPlumbing: Convert Existing Garage And Storage To Adu In An Existing 2 Story Building
  • 2025
    permit on file, unconfirmedGeneral remodel: Demo Chimney And Decorative Wall. Replace Exterior Stairs And Railing. New Entry Door. Remove Fireplaces. Replace Chimney And Wall With Exterior Wall And Parapet.
  • 2024
    permit on file, unconfirmedElectrical: (E-Plan) Main House + Adu - Electric Service Upgrade 400A 120/240V 1 Phase 3 Wire
  • 2024
    permit on file, unconfirmedGeneral remodel: Remove Non-Bearing Wall And Replace Garage Door. (Widen Garage Door)

Manage this home to schedule a service or to update the timeline.