LAHomework Sign in
Los Angeles, CA 90022 · Fraser Ave

1334 Fraser Ave

Built 1924 · 1,110 sq ft
LOT 4,814 SQ FT · 1 STRUCTURE · APN 5245-021-009Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1924
Living area
1,110 sqft
Lot size
4,814 sqft
Structures on lot
1
Bedrooms
3
Bathrooms
2
Home type
Single-family
Parcel (APN)
5245-021-009

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofOn record 2022
Expected 2042 to 2052From the 2022 permit
HVACOn record 2024
Expected 2039 to 2044From the 2024 permit
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 254 homes on Fraser Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2024
    permit on fileElectrical: Electrical To Convert Portion Of Existing Garage W/ Addition Into An Accessory Dwelling Unit (Adu) Total Adu 375.0 Sf
  • 2024
    permit on filePlumbing: Plumbing To Convert Portion Of Existing Garage W/ Addition Into An Accessory Dwelling Unit (Adu) Total Adu 375.0 Sf
  • 2024
    permit on fileHeating & cooling: Mechanical To Convert Portion Of Existing Garage W/ Addition Into An Accessory Dwelling Unit (Adu) Total Adu 375.0 Sf
  • 2024
    permit on filePlumbing: Sewer For Adu From Sewer Ejection Pump To Connection Point At Front Of Existing Dwelling For Converting Garage To Adu With Addition Total Adu 375.0 Sf
  • 2024
    permit on filePlumbing: Up Size Main Water Supply To 1'' From Meter To Front House.
  • 2024
    permit on fileElectrical: Electrical Home Run Circuit For 1 Hp Sewer Ejection Pump For Garage Conversion To Adu With Addition.
  • 2023
    permit on filePlumbing: Install Dishwasher And Garbage Disposal
  • 2023
    permit on fileElectrical: Install 2 New Circuits
  • 2023
    permit on fileKitchen: Kitchen Remodel No Structural Changes
  • 2022
    permit on fileGeneral remodel: Covered Patio To Be Removed. Remove Washer, And Dryer From The Patio.
  • 2022
    permit on fileRoof: Tear Off,Plywood Repair As Needed And Replace 11Sqs Of Roof And Install New Shingles On House Only Using Crrc#0890-0030 Owens Corning Roofing And Asphalt, Llc Trudefinition® Duration® Cool Plus Copper Trail Asphalt Shingle Sri: 22
  • 2018
    permit on fileRoom addition: Convert Garage Back To Original Use

Manage this home to schedule a service or to update the timeline.