LAHomework Sign in
Los Angeles, CA 90026 · Quintero St

1329 Quintero St

Built 1923 · 2,268 sq ft
LOT 7,159 SQ FT · 4 STRUCTURES · APN 5406-010-037Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1923
Living area
2,268 sqft
Lot size
7,159 sqft
Structures on lot
4 main home plus another structure: a garage, guest house or ADU
Bedrooms
6
Bathrooms
4
Home type
Fourplex (4 units)
Parcel (APN)
5406-010-037

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACOn record 2020
Expected 2035 to 2040From the 2020 permit
20262035
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 22 homes on Quintero St →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2020
    permit on fileKitchen: Kitchen/Bathroom Remodel For Residential Buildings (No Structural Changes
  • 2020
    permit on file, unconfirmedKitchen: Kitchen/Bathroom Remodel For Residential Buildings (No Structural Changes).
  • 2020
    permit on fileElectrical: Electrical Rewiring. Subpanel Upgrade
  • 2020
    permit on fileElectrical: Installation Of Subpanel , Change Out Of Outlets, Switches And 12 Recessed Lights.
  • 2020
    permit on filePlumbing: Replacing Toilet, Tub, And Kitchen Sink
  • 2020
    permit on fileHeating & cooling: Heatpump A/C
  • 2020
    permit on filePlumbing: Change Out Faucets, Shower Valve, Angle Stops And Shower Pan
  • 2020
    permit on fileHeating & cooling: Installation Of Range Hood, Bathroom Fan And 1 Combo Unit In Each Bedroom.
  • 2019
    permit on file, unconfirmedGeneral remodel: Foundation Repair (7 Linaer Feet) Per Engineer Detail · AFTER BEFORE CREATIONS INC

Manage this home to schedule a service or to update the timeline.