LAHomework Sign in
Glendale, CA 91207 · Campbell St

1327 Campbell St

Built 1924 · 2,693 sq ft
LOT 7,462 SQ FT · 2 STRUCTURES · APN 5647-012-003Lot Structure
2 items worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1924
Living area
2,693 sqft
Lot size
7,462 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
4
Bathrooms
3
Home type
Single-family
Parcel (APN)
5647-012-003

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

2 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofOn record 2000
Expected 2020 to 2030From the 2000 permit
20262035
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterOn record 2017
Expected 2027 to 2032From the 2017 permit
20262035

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 174 homes on Campbell St →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2019
    permit on fileBathrooms: Bathroom Remodel And Master Bath And Closet Remodel 3 New Pocket Doors Two New Windows To Match (E) And Sliding Repair
  • 2019
    permit on fileSolar: Solar Garage 1 Array, 1.72Kw
  • 2019
    permit on fileSolar: Solar House 4 Arrays, 6.55 Kw
  • 2017
    permit on fileElectrical: One Outlet For Tankless Water Heater Bp1716481
  • 2017
    permit on fileWater heater: 1-Water Heater
  • 2016
    permit on fileElectrical: One Branch Circuit And One 1-5 Hp Changing A Nema 14-50 To Tesla Wall Connector
  • 2016
    permit on fileElectrical: 11 Branch Circuit 1 Dist Panel 30 Spaces One Motor 1-5 Rewire House And Install Ev Charge Station Meter
  • 2015
    permit on fileKitchen: New Or Relocated Hvac Or Electrical Service Requires Separate Permits. Kitchen & Laudry Room Remodeling Nad Replace One Window, One Door, Replace (E) Ceiling Beams (2 Locations) Includes Trades
  • 2011
    permit on fileSolar: New Or Relocated Hvac Or Electrical Service Requires Separate Permits. Install Roof Mounted Photovoltaic System
  • 2010
    permit on filePlumbing: 1 Building Sewer
  • 2010
    permit on filePlumbing: 1 Repipe
  • 2004
    permit on fileElectrical: (1) 200 Amp Svc - (1) Dist. Panel @ 24 Spaces Each.
  • 2000
    permit on fileRoof: Material:Comp Shingle - No. Of Squares:30 Sq - Tear Of Existing (Y/N):Y - Existing No. Of Layers: - New Sheathing (Y/N):Y - Note: All Tear-Offs Require Solid Sheathing. Install Min. 3/8" Structural Wood Panel With 6D Common Nails At 6:12. This May Be Installed Over Existing Spaced Sheathing. -

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Roof replacementExpected 2020 to 2030
  • 2027
    Water heater replacementExpected 2027 to 2032