LAHomework Sign in
Los Angeles, CA 90044 · W 69th St

1315 W 69th St

Built 1914 · 1,330 sq ft
LOT 4,665 SQ FT · 2 STRUCTURES · APN 6014-024-019Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1914
Living area
1,330 sqft
Lot size
4,665 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
3
Bathrooms
2
Home type
Single-family
Parcel (APN)
6014-024-019

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofOn record 2026
Expected 2046 to 2056From the 2026 permit
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 138 homes on W 69th St →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2026
    permit on fileRoof: "Comply With Department Order Effective Date 11/20/2023. Permit Will Expire 30 Days From Issuance Date". Re-Roof With Class A Or B Roof Covering Material Weighing Less Than 6 Pounds Per Sq. Ft. Over Existing Solid Sheathing _22_Squares. Class A Roof Covering Is Required Withinvery High Fire Hazard S
  • 2026
    permit on file, unconfirmedSolar: New Pv System Roof Mount, Pv1, Scope Of Work Include: (15) Modules Of 450 W, Total: 6.75 Kwdc (15) Inverter Of 366 W, Total: 5.49 Kwac (2) Stringpanel: (1) 125A (Combiner)
  • 2026
    permit on file, unconfirmedElectrical: Main Panel Upgrade To 200A. "Comply With Department Order Effective Date11/20/2023. Permit Will Expire 30 Days From Issuance Date"
  • 2026
    permit on fileElectrical: 1- 200Amp Main Service Upgrade"Comply With Department Order Effective Date11/20/2023. Permit Will Expire 30 Days From Issuance Date". Allpermits Shall Be For The Same Time Period Limitation. Ifadditional Assistance Is Needed, Please Call Inspector Johnparker At (323)218-7167. Ceis Case Number Is 995
  • 2022
    permit on file, unconfirmedRoom addition: Addition To (E) Sfd"Comply With Department Order Effective Date 07/22/2021. Permit Will Expire 30 Days From Issuance Date"
  • 2021
    permit on file, unconfirmedKitchen: 1 Kitchen / 2 Bathroom Remodel For Residential Buildings (No Structural Changes). Combo Permit For Electrical And Plumbing"Comply With Department Order Effective Date07/22/2021. Permit Will Expire 30 Days From Issuance Date".
  • 2021
    permit on file, unconfirmedElectrical: Remove Existing Light Fixtures Throughthomeinstall New Can Light Fixtures Throughout Home"Comply With Department Order Effective Date07/22/2021.
  • 2021
    permit on file, unconfirmedHeating & cooling: "Comply With Department Order Effective Date07/22/2021. Permit Will Expire 30 Days From Issuance Date"Install New Hvac Unit
  • 2021
    permit on file, unconfirmedPlumbing: Replace Existing Fixtures. "Comply With Department Order Effective Date07/22/2021. Permit Will Expire 30 Days From Issuance Date".

Manage this home to schedule a service or to update the timeline.