LAHomework Sign in
Glendale, CA 91205 · E Harvard St

1314 E Harvard St

Built 1921 · 3,385 sq ft
LOT 6,403 SQ FT · 3 STRUCTURES · APN 5680-005-028Lot Structure
2 items worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1921
Living area
3,385 sqft
Lot size
6,403 sqft
Structures on lot
3 main home plus another structure: a garage, guest house or ADU
Bedrooms
6
Bathrooms
3
Home type
Triplex (3 units)
Parcel (APN)
5680-005-028

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

2 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofOn record 2011
Expected 2031 to 2041From the 2011 permit
20262035
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterOn record 2000
Usually done by 2015From the 2000 permit

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 100 homes on E Harvard St →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2026
    permit on file, unconfirmedElectrical: Over Head 2 Meter Panel Upgrade
  • 2026
    permit on fileKitchen: Unit 1314: Convert Existing 130 Sq.Ft. Den To Bedroom. Convert 45 Sq.Ft. Portion Of Kitchen To Full Bathroom. (E) Kitchen Door Opening To Be Infilled. Total Number Of Bedrooms: 3, Total Number Of Bathrooms: 2. No Change In Total Square Footage. Unit 1314 1/2: Convert Existing 130 Sq.Ft. Den Tobedroo
  • 2026
    permit on fileBathrooms: Convert 55 Sq.Ft. Portion Of Entranceto 1 Full Bathroom. Total Number Of Bedrooms: 2.Total Number Of Bathrooms: 2-1/2. No Change In Total Square Footage. No Changes To Landscaping Or Hardscaping.
  • 2026
    permit on file, unconfirmedGeneral remodel: Scope Of Work Includes Removal And Replacement Of Twenty (20) Existing Windows At 1314 1/2 E Harvard Street. No Changes To Window Size, Location, Or Operation Are Proposed Under This Permit. No Structural Alterations Are Included Or Approved Under This Permit.
  • 2026
    permit on fileGeneral remodel: Scope Of Work Includes Removal And Replacement Of Fifteen (15) Existing Windows At 1314 E Harvard Street Unit A. No Changes To Window Size, Location, Or Operation Are Proposed Under This Permit. No Structural Alterations Are Included Or Approved Under This Permit.
  • 2025
    permit on fileKitchen: Property Overview: This Property Contains Three Separate Dwelling Units Located In Two Structures: Front Structure: 1314 E Harvard Street (Duplex) And 1314 1/2 E Harvard Street (Duplex) Rear Structure: 1314 E Harvard Street, Unit A. Because Inspections And Work Will Occur Separately For Each Dwellin
  • 2025
    permit on fileKitchen: Property Overview: This Property Contains Three Separate Dwelling Units Located In Two Structures: Front Structure: 1314 E Harvard Street (Duplex) And 1314 1/2 E Harvard Street (Duplex) Rear Structure: 1314 E Harvard Street, Unit A. Because Inspections And Work Will Occur Separately For Each Dwellin
  • 2025
    permit on fileKitchen: Property Overview: This Property Contains Three Separate Dwelling Units Located In Two Structures: Front Structure: 1314 E Harvard Street (Duplex) And 1314 1/2 E Harvard Street (Duplex) Rear Structure: 1314 E Harvard Street, Unit A. Because Inspections And Work Will Occur Separately For Each Dwellin
  • 2011
    permit on fileRoof: Residential Reroof As Follows: Sfd With Detached Garage This Is A Change Of Roofing Material (Y/N): No Proposed Roofing Material: Comp Shingle, Class A Squares (100 Sf) Being Installed: 13 Tear Off Existing (Y/N): Yes Existing Layers Of Roofing: 2 New Sheathing Being Installed (Y/N): No High Fire Ha
  • 2011
    permit on fileRoof: Residential Reroof As Follows: This Is A Change Of Roofing Material (Y/N): No Proposed Roofing Material: Built-Up Roof Squares (100 Sf) Being Installed: 15 Tear Off Existing (Y/N): Yes Existing Layers Of Roofing: 2 New Sheathing Being Installed (Y/N): No High Fire Hazard Zone (Y/N): No All Tear-Offs
  • 2011
    permit on fileRoof: Residential Reroof As Follows: Detached Garage For Sfd This Is A Change Of Roofing Material (Y/N): No Proposed Roofing Material: Built-Up Roof, Class A Squares (100 Sf) Being Installed: 3 Tear Off Existing (Y/N): Yes Existing Layers Of Roofing: 2 New Sheathing Being Installed (Y/N): No High Fire Haz
  • 2000
    permit on fileWater heater: - 1314 E. Harvard St A, B, C. - - 1 Water Heater/Vent - 1 Water System Without Fixtures. -

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Water heater replacementUsually done by 2015
  • 2031
    Roof replacementExpected 2031 to 2041