LAHomework Sign in
Glendale, CA 91208 · Capistrano Ave

1309 Capistrano Ave

Built 1947 · 2,125 sq ft
LOT 8,428 SQ FT · 1 STRUCTURE · APN 5614-033-016Lot Structure
2 items worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1947
Living area
2,125 sqft
Lot size
8,428 sqft
Structures on lot
1
Bedrooms
3
Bathrooms
3
Home type
Single-family
Parcel (APN)
5614-033-016

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

2 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofOn record 2002
Expected 2022 to 2032From the 2002 permit
20262035
HVACOn record 2009
Expected 2024 to 2029From the 2009 permit
20262035
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 47 homes on Capistrano Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2009
    permit on fileElectrical: 1 200Amp Service
  • 2009
    permit on fileElectrical: 1 Temporary Service
  • 2009
    permit on fileHeating & cooling: 1 Fau A Nd 1 Compressor
  • 2009
    permit on fileRoom addition: This Is A Combination Permit To Include All Trades Only In Area Affected By The Project. - 1St Floor Addition 60-Sf Remodel Kitchen And Demo. 2Nd Floor Addition 168-Sf. (Library) Remodel M. Bath New Second Bath, Remodel Bedroom New Wood Windows Entire Residence. - Proposed Addition Is 40% Of Existin
  • 2002
    permit on fileRoof: Material:Class A - No. Of Squares:25 - Tear Of Existing (Y/N):Y - Existing No. Of Layers:Shakes - New Sheathing (Y/N):Y - Note: All Tear-Offs Require Solid Sheathing. Install Min. 3/8" Structural Wood Panel With 6D Common Nails At 6:12. This May Be Installed Over Existing Spaced Sheathing. -

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Roof replacementExpected 2022 to 2032
  • Now
    HVAC replacementExpected 2024 to 2029