LAHomework Sign in
Los Angeles, CA 91331 · Cascade Ct

13084 Cascade Ct

Built 2007 · 1,773 sq ft
LOT 3,085 SQ FT · 1 STRUCTURE · APN 2626-016-053Lot Structure
2 items worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
2007
Living area
1,773 sqft
Lot size
3,085 sqft
Structures on lot
1
Bedrooms
4
Bathrooms
3
Home type
Single-family
Parcel (APN)
2626-016-053

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

2 worth planning for · 0 to confirm. Open "How we estimate this" on any card.
RoofOn record 2024
Expected 2044 to 2054From the 2024 permit
HVACWorth a look now
Expected 2022 to 2027From build year 2007
20262035
Water heaterWorth a look now
Usually done by 2022From build year 2007

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 10 homes on Cascade Ct →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2024
    permit on fileRoof: Re-Roof With Class A Or B Roof Covering Material Weighing Less Than 6 Pounds Per Sq. Ft. Over Existing Solid Sheathing 7 Squares. Class A Roof Covering Is Required Within Very High Fire Hazard Severity Zone (Vhfhsz). For Residential Roof Replacement > 50% Of The Total Roof Area, Apply Cool Roof Prod
  • 2024
    permit on fileSolar: Installation Of A Roof-Mounted Microinverter/Ac Module Solar Photovoltaic (Pv) System, Not Exceeding 38.4Kw In A 1 Or 2 Family Dwelling.
  • 2024
    permit on fileElectrical: We Need To Upgrade The Meter Main Electrical Panel

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Water heater replacementUsually done by 2022
  • Now
    HVAC replacementExpected 2022 to 2027