LAHomework Sign in
Glendale, CA 91207 · Loreto Dr

1306 Loreto Dr

Built 1926 · 2,008 sq ft
LOT 9,062 SQ FT · 2 STRUCTURES · APN 5650-030-002Lot Structure
1 item worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1926
Living area
2,008 sqft
Lot size
9,062 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
4
Bathrooms
3
Home type
Single-family
Parcel (APN)
5650-030-002

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

1 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofOn record 2015
Expected 2035 to 2045From the 2015 permit
20262035
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterOn record 2015
Expected 2025 to 2030From the 2015 permit
20262035

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 19 homes on Loreto Dr →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2020
    permit on fileSolar: Solar
  • 2015
    permit on fileRoof: Reroof As Follows:Detached Garage This Is A Change Of Roofing Material (Y/N): N Proposed Roofing Material: Built Up Roof Squares (100 Sf) Being Installed: 5 Tear Off Existing (Y/N): Y Existing Layers Of Roofing: 1 New Sheathing Being Installed (Y/N): N High Fire Hazard Zone (Y/N): N All Tear-Offs Re
  • 2015
    permit on fileRoof: Reroof As Follows:Sfd This Is A Change Of Roofing Material (Y/N): N Proposed Roofing Material: Built Up Roof Squares (100 Sf) Being Installed: 28 Tear Off Existing (Y/N): Y Existing Layers Of Roofing: 1 New Sheathing Being Installed (Y/N): N High Fire Hazard Zone (Y/N): N All Tear-Offs Require Solid
  • 2015
    permit on fileWater heater: Intalling New Tankless Water Heater
  • 2003
    permit on fileElectrical: 1 200 Amp Service And 3 Branch Circuits

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Water heater replacementExpected 2025 to 2030