LAHomework Sign in
Glendale, CA 91205 · E Palmer Ave

1304 E Palmer Ave

Built 1989 · 2,320 sq ft
LOT 5,988 SQ FT · 1 STRUCTURE · APN 5679-014-013Lot Structure
2 items worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1989
Living area
2,320 sqft
Lot size
5,988 sqft
Structures on lot
1
Bedrooms
4
Bathrooms
3
Home type
Single-family
Parcel (APN)
5679-014-013

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

2 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofOn record 2006
Expected 2026 to 2036From the 2006 permit
20262035
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterOn record 2020
Expected 2030 to 2035From the 2020 permit
20262035

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 177 homes on E Palmer Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2020
    permit on fileWater heater: 1 Water Heater
  • 2017
    permit on filePlumbing: 1 Gas System (Medium Pressure)
  • 2008
    permit on fileWater heater: (1) Water Heater
  • 2006
    permit on fileRoof: Residential Reroof As Follows:- - - This Is A Change Of Roofing Material (Y/N):Tile To Tile Orig. 7.6 Lbs New 5.8 Lbs Per Sq. - Proposed Roofing Material:Lite Weight Tile - Squares (100 Sf) Being Installed: - Tear Off Existing (Y/N):Yes - Existing Layers Of Roofing:1 - New Sheathing Being Installed
  • 2004
    permit on fileGeneral remodel: Replace Existing Windows And Patio Doors With Vinyl Framed Dual Glazed Windows And Doors For Both Floors.

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Roof replacementExpected 2026 to 2036
  • 2030
    Water heater replacementExpected 2030 to 2035