LAHomework Sign in
Los Angeles, CA 90272 · Amalfi Dr

1301 Amalfi Dr

Built 2008 · 8,513 sq ft
LOT 22,742 SQ FT · 1 STRUCTURE · APN 4425-016-002Lot Structure
3 items worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
2008
Living area
8,513 sqft
Lot size
22,742 sqft
Structures on lot
1
Bedrooms
6
Bathrooms
10
Home type
Single-family
Parcel (APN)
4425-016-002

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

3 worth planning for · 0 to confirm. Open "How we estimate this" on any card.
RoofComing up
Expected 2028 to 2038From build year 2008
20262035
HVACWorth a look now
Expected 2023 to 2028From build year 2008
20262035
Water heaterWorth a look now
Usually done by 2023From build year 2008

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 160 homes on Amalfi Dr →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2026
    permit on file, unconfirmedHeating & cooling: Installing New Ducted Split Heat Pump Ducting
  • 2025
    permit on fileSolar: [Eplan] New Ess & Pv System Roof Mount On Pv1, Generator Connected To Sytem For Charging Battery, And Pcs'S Battery Import Only Mode: (39) Modules Of 440 W, Total: 17.16 Kwdc (39) Inverter Of 384 W, Total: 14.976 Kwac (4) Ess Of 5000 W, Total: 20 Kwh (4) Stringpanel: (1) 225A (Subpanel), (1) 200A (I
  • 2023
    permit on file, unconfirmedGeneral remodel: Eplaninterior & Exterior Alteration To Existing 2 Story Sfd With Basement. Demolish And Fully Extend Loft In Portion Of 1St & 2Nd Floor.
  • 2013
    permit on fileElectrical: Electrical Permit · SUNGATE ENERGY SOLUTIONS INC
  • 2013
    permit on fileElectrical: Electrical Permit · SUNGATE ENERGY SOLUTIONS INC

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Water heater replacementUsually done by 2023
  • Now
    HVAC replacementExpected 2023 to 2028
  • 2028
    Roof replacementExpected 2028 to 2038