LAHomework Sign in
Los Angeles, CA 90019 · S Highland Ave

1298 S Highland Ave

Built 1928 · 3,322 sq ft
LOT 5,921 SQ FT · 2 STRUCTURES · APN 5084-025-012Lot Structure
1 item worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1928
Living area
3,322 sqft
Lot size
5,921 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
6
Bathrooms
4
Home type
Duplex (2 units)
Parcel (APN)
5084-025-012

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

1 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACOn record 2014
Expected 2029 to 2034From the 2014 permit
20262035
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 179 homes on S Highland Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2022
    permit on file, unconfirmedPlumbing: Rough Plumbing
  • 2022
    permit on file, unconfirmedWater heater: Rough Plumbing Of Water Lines And Drain Lines, Installation Of Water Heater.
  • 2022
    permit on file, unconfirmedWater heater: Rough Plumbing Of Water And Drain Lines, Installation Of Water Heater.
  • 2022
    permit on file, unconfirmedWater heater: Re-Pipe Of Drain Lines And Water Lines, Installation Of Tankless Water Heater
  • 2022
    permit on file, unconfirmedWater heater: Re-Plumbing Of Water Lines, Drain Lines, Install Tankless Water Heater
  • 2021
    permit on fileGeneral remodel: Window (40) Change-Out (Same Size & Type) For Residential Buildings. Dual Glazing, Labeled And Certified By National Fenestration Rating Council (Nfrc), Is Required For Doors And Windows Replaced In All Residential Buildings, Three Stories Or Less, Per Section 150.2(B) Ib Of Title 24.
  • 2021
    permit on file, unconfirmedGeneral remodel: Replace Damaged Wood Framing (Less Than 10%). Same Size, Spacing, Type.
  • 2021
    permit on file, unconfirmedKitchen: Interior Kitchen Remodel/Repair (No Changes In Walls Or Openings). Interior Bathroom Remodel/Repair (No Changes In Walls Or Openings).
  • 2021
    permit on fileElectrical: Meter Panel Upgrade With (2) Subpanels.
  • 2021
    permit on file, unconfirmedElectrical: Coplete Rewire
  • 2021
    permit on file, unconfirmedElectrical: Electrical Rewire
  • 2021
    permit on fileSolar: Installation Of Roof-Mounted Solar Pv System, Not Exceeding A Total Ac Output Of 10 Kw, In A 1 Or 2 Family Dwelling
  • 2021
    permit on fileElectrical: (1) New 125A Sub Panel
  • 2021
    permit on filePlumbing: Installation Of (2) Sgsov
  • 2021
    permit on file, unconfirmedHeating & cooling: Install New Heating And Air Conditioning.
  • 2018
    permit on filePlumbing: Plumbing Permit · RITZ PLUMBING
  • 2014
    permit on file, unconfirmedGeneral remodel: To Add 6 Piers And A 4"X 6"Girder, Under Raised Floor Framing. All Wor · WEINSTEIN CONSTRUCTION CORPORATION
  • 2014
    permit on fileHeating & cooling: Hvac Permit · IWAI COOLING AND HEATING

Manage this home to schedule a service or to update the timeline.

Coming up
  • 2029
    HVAC replacementExpected 2029 to 2034