LAHomework Sign in
Pasadena, CA 91103 · Linda Vista Ave

1288 Linda Vista Ave

Built 1940 · 3,246 sq ft
LOT 10,147 SQ FT · 3 STRUCTURES · APN 5705-003-009Lot Structure
1 item worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1940
Living area
3,246 sqft
Lot size
10,147 sqft
Structures on lot
3 main home plus another structure: a garage, guest house or ADU
Bedrooms
4
Bathrooms
5
Home type
Single-family
Parcel (APN)
5705-003-009

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

1 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofOn record 1999
Expected 2019 to 2029From the 1999 permit
20262035
HVACOn record 2017
Expected 2032 to 2037From the 2017 permit
20262035
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 178 homes on Linda Vista Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2023
    permit on fileGeneral remodel: New Detached Patio Cover W/ Covered Opening System
  • 2023
    permit on fileElectrical: Electrical Permit For New Detached Patio Cover W/ Covered Opening System
  • 2023
    permit on fileElectrical: 200 Amp Main Panel Upgrade, Existing Mp Cannot Accpet Branch Breakers Greater Than 100 A. Sytem Requires 200A Branch Breaker To Be Installed - Mpu Install To Install Msp That Can Accept 200A Branch Breakers
  • 2023
    permit on fileSolar: Installation Of Roof Mounted Pv Solar 6 Kw, (15) Modules
  • 2018
    permit on filePool: Add New Spa To Exiting Pool @ 49 S/F, New Plumbing Plaster
  • 2017
    permit on fileElectrical: Electrical For Addition
  • 2017
    permit on fileHeating & cooling: Mechanical For Addition And Remodel
  • 2017
    permit on filePlumbing: Plumbing For Addition
  • 2016
    permit on fileRoom addition: Add New 2Nd Floor 1284 S/F/1St Floor Addition @ 36 S/F.Remodel Existing First Floor @ 1,894
  • 2016
    permit on fileElectrical: Upgrade Panel To 200 Amp Panel
  • 2009
    permit on file, unconfirmedGeneral remodel: Historic Building Diagram
  • 1999
    permit on fileRoof: Remove Existing Roofing + Install 1/2" Cdx Playwoo New Metal Trim-30 Yr Fiberglass Shingle Class A

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Roof replacementExpected 2019 to 2029