LAHomework Sign in
Pasadena, CA 91104 · N Mar Vista Ave

1278 N Mar Vista Ave

Built 1912 · 1,220 sq ft
LOT 8,259 SQ FT · 3 STRUCTURES · APN 5740-005-008Lot Structure
2 items worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1912
Living area
1,220 sqft
Lot size
8,259 sqft
Structures on lot
3 main home plus another structure: a garage, guest house or ADU
Bedrooms
3
Bathrooms
2
Home type
Single-family
Parcel (APN)
5740-005-008

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

2 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofOn record 1995
Usually done by 2025From the 1995 permit
HVACOn record 2009
Expected 2024 to 2029From the 2009 permit
20262035
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 178 homes on N Mar Vista Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2025
    permit on fileElectrical: Express Permit. Installing Hardwired Chargepoint Ev Charger On The South Side Of The House And Running The Line From The Breaker On The North Side Of The House.
  • 2023
    permit on filePlumbing: Replace Galvanized Water Pipes And Cast Iron Sewer Line Under The Property
  • 2023
    permit on fileElectrical: Express Permit. 1. Install A 40A/240V Branch-Circuit For Elec. Oven 2. Add A Dedicated 20A/120V Circuit For Ext. W.P. Gfci
  • 2013
    permit on fileElectrical: New Meter Upgrade Underground Service To 200 Amps
  • 2009
    permit on fileHeating & cooling: Ventilation Fan For Guest Bath
  • 2009
    permit on fileBathrooms: Convert Closet Into Guest Bath (No New Sq/F)
  • 2009
    permit on filePlumbing: Plumbing For Guest Bath
  • 2009
    permit on fileElectrical: Electrical For Guest Bath
  • 2009
    permit on file, unconfirmedGeneral remodel: Historic Building Diagram
  • 2006
    permit on fileGeneral remodel: Enclose Area In Garage For Tool Crib. Drywall Interior Walls Of Garage. Run Electrical To Crib For Lights And Wall Power. No New Sq/F - (Enclose 6X6 Within Existing Garage)
  • 2006
    permit on fileElectrical: Electrical For Enclosure
  • 2003
    permit on fileElectrical: Replace Service Riser Bent From The Wind
  • 1995
    permit on fileRoof: Reroof House Only W/Gaf Ul R21 Class A
  • 1992
    permit on fileGeneral remodel: Bu - Foundation Anchorage Retrofit
  • 1991
    permit on filePlumbing: Pl - Relocate Automatic Washer To New Location

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Roof replacementUsually done by 2025
  • Now
    HVAC replacementExpected 2024 to 2029