LAHomework Sign in
Glendale, CA 91201 · Elm Ave

1275 Elm Ave

Built 1924 · 432 sq ft
LOT 2,461 SQ FT · 1 STRUCTURE · APN 5621-010-015Lot Structure
1 item worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1924
Living area
432 sqft
Lot size
2,461 sqft
Structures on lot
1
Bedrooms
1
Bathrooms
1
Home type
Single-family
Parcel (APN)
5621-010-015

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

1 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofOn record 2003
Expected 2023 to 2033From the 2003 permit
20262035
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 110 homes on Elm Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2025
    permit on fileSolar: Installation Of An Ess System 38.4Kwh Or Less And/Or Flush Roof Mounted Photovoltaic System On A Residential Single-Family Dwelling, Including Adus, 38Kw Or Less. This Installation Shall Comply With The Electrical, Fire And Building Provisions Of The Most Recent Applicable Code Cycle.
  • 2003
    permit on fileRoof: Material: Comp Shingle Class A (Reroof Only Not Removing Roof Framing Or Walls) - No. Of Squares: 5 Sqs - Tear Of Existing (Y/N): Y - Existing No. Of Layers: 2 - New Sheathing (Y/N): Y - Note: All Tear-Offs Require Solid Sheathing. Install Min. 3/8" Structural Wood Panel With 6D Common Nails At 6:12

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Roof replacementExpected 2023 to 2033