LAHomework Sign in
Pasadena, CA 91105 · Club House Dr

1256 Club House Dr

Built 1970 · 3,248 sq ft
LOT 15,531 SQ FT · 1 STRUCTURE · APN 5715-026-024Lot Structure
1 item worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1970
Living area
3,248 sqft
Lot size
15,531 sqft
Structures on lot
1
Bedrooms
4
Bathrooms
4
Home type
Single-family
Parcel (APN)
5715-026-024

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

1 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofOn record 2001
Expected 2021 to 2031From the 2001 permit
20262035
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 15 homes on Club House Dr →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2026
    permit on file, unconfirmedElectrical: Main Panel Upgrade From 150A To 200A - Same Location. Replacing Existing Sub Panel.
  • 2026
    permit on file, unconfirmedKitchen: Kitchen And Primary Bathroom Remodel Of An Existing Two Story, Wood Framed Single Family Residence With Attached Garage And Basement. No Alteration - No Change To Area Or Footprint
  • 2004
    permit on file, unconfirmedGeneral remodel: Historic Building Diagram
  • 2001
    permit on fileRoof: Tear Off Old Rock Roof Installnew 40 Yr Class A Composition

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Roof replacementExpected 2021 to 2031