LAHomework Sign in
Pasadena, CA 91105 · S Orange Grove Blvd

1245 S Orange Grove Blvd Unit 5

Built 1959 · 3,454 sq ft
SHARED CONDO LOT · APN 5718-018-029Lot Structure
3 items worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1959
Living area
3,454 sqft
Lot
Shared (condo complex)
Bedrooms
3
Bathrooms
3
Home type
Condo / townhome
Parcel (APN)
5718-018-029

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

3 worth planning for · 0 to confirm. Open "How we estimate this" on any card.
RoofOn record 1991
Usually done by 2021From the 1991 permit
HVACOn record 2012
Expected 2027 to 2032From the 2012 permit
20262035
Water heaterOn record 2012
Expected 2022 to 2027From the 2012 permit
20262035

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 722 homes on S Orange Grove Blvd →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2026
    permit on file, unconfirmedHeating & cooling: Mechanical For Interior Remodel Of Existing Residential Unit Baths. Scope Includes Soft Demo Of Existing Walls. No Change To Windows Or Exterior. (3 Bathrooms Total).
  • 2026
    permit on file, unconfirmedElectrical: Electrical For Interior Remodel Of Existing Residential Unit Baths. Scope Includes Soft Demo Of Existing Walls. No Change To Windows Or Exterior. (3 Bathrooms Total).
  • 2026
    permit on file, unconfirmedBathrooms: Interior Remodel Of Existing Residential Unit Baths. Scope Includes Soft Demo Of Existing Walls. No Change To Windows Or Exterior. (3 Bathrooms Total).
  • 2026
    permit on file, unconfirmedPlumbing: Plumbing For Interior Remodel Of Existing Residential Unit Baths. Scope Includes Soft Demo Of Existing Walls. No Change To Windows Or Exterior. (3 Bathrooms Total).
  • 2015
    permit on filePlumbing: Install Plumbing Fixtures For Remodel
  • 2015
    permit on fileElectrical: Install (143) Electrical Fixtures
  • 2012
    permit on fileHeating & cooling: Legalize Installation Of Furnance
  • 2012
    permit on fileWater heater: Legalize Installation Of Water Heater
  • 2010
    permit on fileGeneral remodel: Rebuild Balconyu To Both Unit 3. Replace All Damged Floor Joist That Telescope Over Balcony Due To Water & Termite Damage. Build Small Pony Wall As Well..
  • 1991
    permit on fileRoof: Rf - Re-Roof Condo Bldg. W/ Built-Up Material-Clas

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Roof replacementUsually done by 2021
  • Now
    Water heater replacementExpected 2022 to 2027
  • 2027
    HVAC replacementExpected 2027 to 2032