LAHomework Sign in
Los Angeles, CA 90292 · Roma Ct

124 Roma Ct

Built 1989 · 4,469 sq ft
LOT 2,874 SQ FT · 1 STRUCTURE · APN 4295-002-061Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1989
Living area
4,469 sqft
Lot size
2,874 sqft
Structures on lot
1
Bedrooms
3
Bathrooms
5
Home type
Single-family
Parcel (APN)
4295-002-061

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 3 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 62 homes on Roma Ct →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2025
    permit on filePool: Eplan: (N) Prefab Spa Above Ground
  • 2021
    permit on fileKitchen: (1) Kitchen/(3) Bathroom Remodel For Residential Buildings (No Structural Changes).
  • 2021
    permit on fileGeneral remodel: 13 Door Change-Out (Same Size & Type) For Residential Buildings. Dual Glazing, Labeled And Certified By National Fenestration Rating Council (Nfrc), Is Required For Doors And Windows Replaced In All Residential Buildings, Three Stories Or Less, Per Section 152(B) Of Title 24.
  • 2021
    permit on fileElectrical: Kitchen...3 - New Kitchen Led Recessed. 2 - Under Counter New Under Counter Led Light 2 - 220 Outlet 12 - Outlet Gfcibathrooms...1Gfci - Jr Bathroom I2Gfci - Hallwaymaster...13Gfci
  • 2021
    permit on filePlumbing: Plumbing For All Existing Locations: Kitchen: Kitchen Sink, Gas Stove, Dishwashermaster Bath: Tub, Faucet, Shower, 2 Sinks, 2 Toiletshallway Bath: Tub/Shower Combo, Sink, Toiletjr Bath: Shower, Vanity, Toilet

Manage this home to schedule a service or to update the timeline.