LAHomework Sign in
Los Angeles, CA 90019 · S Gramercy Pl

1231 S Gramercy Pl

Built 1916 · 2,642 sq ft
LOT 10,648 SQ FT · 2 STRUCTURES · APN 5081-027-016Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1916
Living area
2,642 sqft
Lot size
10,648 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
5
Bathrooms
2
Home type
Single-family
Parcel (APN)
5081-027-016

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofOn record 2026
Expected 2046 to 2056From the 2026 permit
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 69 homes on S Gramercy Pl →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2026
    permit on fileRoof: Re-Roof With Class A Or B Material Weighing Less Than 6 Pounds Per Sq. Ft. Over Existing Solid Sheathing_25_____Squares. Class A Roof Covering Is Required Within Very High Fire Hazard Severity Zone(Vhfhsz).For Residential Roof Replacement>50% Of The Total Roof Area, Apply Cool Roof Product Labeled A
  • 2020
    permit on filePlumbing: Replacing Partial Drain Pipes With Abs Material Foe 3 Bathroom Sinks , Kitchen Sink,Washing Machine And 1 Shower Tie In To Existing Vent Pipes .Replacing Horizontal Drain Pipes Under The Hose.Tie In To Existing 3 Toilets, 1 Tub And 1 Shower.1 New Clean Out.Tie In To The Last Joint Before Existing Fo
  • 2020
    permit on filePlumbing: Repiping 2 1/2 Bathroom House With Copper Horizontal And Uponor Pex Verticals To The Fixtures.Replacing Approximately 70 Feet Of Main Line With Copper And New Pressure Regulator
  • 2020
    permit on filePlumbing: Install A Shower Pan

Manage this home to schedule a service or to update the timeline.