Whittier, CA 90604 · Bonavista Ln

12223 Bonavista Ln

Built 1955 · 1,235 sq ft
LOT 6,391 SQ FT · 1 STRUCTURE · APN 8031-018-015Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1955
Living area
1,235 sqft
Lot size
6,391 sqft
Structures on lot
1
Bedrooms
3
Bathrooms
2
Home type
Single-family
Parcel (APN)
8031-018-015

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACOn record 2022
Expected 2037 to 2042From the 2022 permit
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 87 homes on Bonavista Ln →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2024
    permit on fileSolar: Install 20 Roof Mounted Solar Panels, 7.700Kw Solar Service System, 10 Micro-Inverters, 1 Battery, Tying Into An Existing 200A Main Service Panel.
  • 2024
    permit on file, unconfirmedSolar: Install 20 Roof Mounted Solar Panels, 7.700Kw Solar Service System, 10 Micro-Inverters, 1 Battery, Tying Into An Existing 200A Main Service Panel.
  • 2023
    permit on filePool: New Swimming Pool 30X15 7X7 Spa
  • 2022
    permit on fileKitchen: 1. Remodel The Existing Kitchen. 2. Remodel The Existing Bathrooms 3. New Master Bathroom 4. New Master Bedroom 5. Enlarge The Living Room. 6. Push Out Part Of North Exterior Wall 7. Expand The Living Room. 8. Add A New Bedroom 9. Relocate Laundry
  • 2022
    permit on fileElectrical: 1. Remodel The Existing Kitchen. 2. Remodel The Existing Bathrooms 3. New Master Bathroom 4. New Master Bedroom 5. Enlarge The Living Room. 6. Push Out Part Of North Exterior Wall 7. Expand The Living Room. 8. Add A New Bedroom 9. Relocate Laundry
  • 2022
    permit on fileHeating & cooling: 1. Remodel The Existing Kitchen. 2. Remodel The Existing Bathrooms 3. New Master Bathroom 4. New Master Bedroom 5. Enlarge The Living Room. 6. Push Out Part Of North Exterior Wall 7. Expand The Living Room. 8. Add A New Bedroom 9. Relocate Laundry
  • 2022
    permit on filePlumbing: 1. Remodel The Existing Kitchen. 2. Remodel The Existing Bathrooms 3. New Master Bathroom 4. New Master Bedroom 5. Enlarge The Living Room. 6. Push Out Part Of North Exterior Wall 7. Expand The Living Room. 8. Add A New Bedroom 9. Relocate Laundry
  • 2022
    permit on fileElectrical: We Need To Install A Temporary Power Pole To Continue With Construction And Have Electrical Power To The Job Site (Ref. Bldr210908007999)
  • 2018
    permit on filePlumbing: House Sewer Drain Line: Re-Drain Fixtures & Water Line Repipe To (6) Fixtures (All Work Done Under House).

Manage this home to schedule a service or to update the timeline.