LAHomework Sign in
Los Angeles, CA 90037 · W 55th St

1218 W 55th St

Built 1912 · 1,172 sq ft
LOT 5,247 SQ FT · 2 STRUCTURES · APN 5002-010-026Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1912
Living area
1,172 sqft
Lot size
5,247 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
3
Bathrooms
1
Home type
Single-family
Parcel (APN)
5002-010-026

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 3 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 281 homes on W 55th St →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2025
    permit on fileElectrical: 2 Gang Meter Servicing 1218 And 1220 W 55Th St. Main Service Located At 1220 W 55Th Stref. #25041-70000-23995Total Connected Load Not To Exceed 400 Amps "Comply With Department Order Effective Date09/29/2015. Permit Will Expire 30 Days From Issuance Date". Allpermits Shall Be For The Same Time Perio
  • 2025
    permit on fileElectrical: Install Subpanel. Main Service Located At 1220 W 55Th St Ref. #25041-70000-23993Total Connected Load Not To Exceed 400 Amps"Comply With Department Order Effective Date09/29/2015. Permit Will Expire 30 Days From Issuance Date". Allpermits Shall Be For The Same Time Period Limitation. Ifadditional Ass
  • 2024
    permit on file, unconfirmedElectrical: Main Panel Installtion 100 Amp"Comply With Department Order Effective Date09/29/2015. Permit Will Expire 30 Days From Issuance Date".

Manage this home to schedule a service or to update the timeline.