LAHomework Sign in
Glendale, CA 91205 · Orange Grove Ave

1215 Orange Grove Ave

Built 1923 · 1,667 sq ft
LOT 6,817 SQ FT · 2 STRUCTURES · APN 5680-005-010Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1923
Living area
1,667 sqft
Lot size
6,817 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
4
Bathrooms
2
Home type
Duplex (2 units)
Parcel (APN)
5680-005-010

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofOn record 2017
Expected 2037 to 2047From the 2017 permit
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 127 homes on Orange Grove Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2019
    permit on fileGeneral remodel: Replacing Front Porch Rails And Stair Railings With Reinforced Vinyl Up To Code Porch Less Than 30' Below Adjacent Grade Cd
  • 2017
    permit on fileRoof: Roof
  • 2007
    permit on fileElectrical: (15) Branch Circuits, (1) Panel W/ 20 Spaces
  • 2006
    permit on fileGeneral remodel: Voluntary Foundation Anchor Bolting Per Los Angeles City Standard Plan #6 Foundation Replacement Per Detail I
  • 2002
    permit on filePlumbing: 1 Bathroom
  • 2001
    permit on fileRoof: Material:Class A - No. Of Squares:9 - Tear Of Existing (Y/N):Y - Existing No. Of Layers:4 - New Sheathing (Y/N):Y - Note: All Tear-Offs Require Solid Sheathing. Install Min. 3/8" Structural Wood Panel With 6D Common Nails At 6:12. This May Be Installed Over Existing Spaced Sheathing. -

Manage this home to schedule a service or to update the timeline.