LAHomework Sign in
Granada Hills, CA 91344 · Delante Way

12144 Delante Way

Built 2003 · 4,944 sq ft
LOT 20,953 SQ FT · 2 STRUCTURES · APN 2601-073-008Lot Structure
2 items worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
2003
Living area
4,944 sqft
Lot size
20,953 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
5
Bathrooms
5
Home type
Single-family
Parcel (APN)
2601-073-008

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

2 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofWorth a look now
Expected 2023 to 2033From build year 2003
20262035
HVACWorth a look now
Usually done by 2023From build year 2003
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 28 homes on Delante Way →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2024
    permit on file, unconfirmedElectrical: Install An Ev For Car Charging.
  • 2021
    permit on fileSolar: Zero Dollar Fees Due To Ab1414. [Eplan]Pc Only, Changes To An Approved Set Of Plans, Permit#200411000035947. Changes Include The Removal Of Spi Panel And Equipment Location. ______________________Roof Mounted Pv Solar + Energy Storage Systems24 Panels X 8.16 Kw Pv Array 2 X 13.5 Kwh Ess
  • 2020
    permit on fileSolar: (E-Plan)New Pv1 Roof-Mounted Installation For An Existing 300 A Msp. Scope Of Work Includes 24 Modules, 24 Optimizers, 1 Central Inverter, 2 Energy Storage Systems, And 3 Panels Of 200 Amps. System Size: 8.16 Kw Dc; 7.6 Kw Acsolar Pv Installation Shall Comply With Los Angeles Fire Department'S Fire
  • 2015
    permit on file, unconfirmedRoom addition: New Second Story Addition Above Garage To Extend Bedroom At An (E) 2-S · OWNER-BUILDER
  • 2014
    permit on fileRoom addition: Convert 1-Car Garage To Recreational Room For (E) 2-Story Single Famil · OWNER-BUILDER

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    HVAC replacementUsually done by 2023
  • Now
    Roof replacementExpected 2023 to 2033