LAHomework Sign in
Los Angeles, CA 90063 · N Hicks Ave

1211 N Hicks Ave

Built 2016 · 2,156 sq ft
LOT 5,269 SQ FT · APN 5229-013-017Lot Structure
2 items worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
2016
Living area
2,156 sqft
Lot size
5,269 sqft
Bedrooms
3
Bathrooms
3
Home type
Single-family
Parcel (APN)
5229-013-017

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

2 worth planning for · 0 to confirm. Open "How we estimate this" on any card.
RoofOn record 2023
Expected 2043 to 2053From the 2023 permit
HVACComing up
Expected 2031 to 2036From build year 2016
20262035
Water heaterWorth a look now
Expected 2026 to 2031From build year 2016
20262035

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 148 homes on N Hicks Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2023
    permit on fileRoof: T/O Existing Flat Roofing To Sheathing. Replace Wood As Needed. Install 1 Layer 28Lb Glass Base. Install 1 Layer 72Lb Gafglas Mineral Cap Sheet On 24 Sqs Of House And Attached Garage Using Crrc#0616-0011A 0616-0011A Polyglass Usa, Inc. Polyfresko G Asphaltic Membrane Bright White Sri:96
  • 2022
    permit on fileSolar: Installation Of A 12 Module, Roof-Mounted, Solar Pv System With 1 Inverter. System Size Is 4.800Kwp

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Water heater replacementExpected 2026 to 2031
  • 2031
    HVAC replacementExpected 2031 to 2036