LAHomework Sign in
Los Angeles, CA 91604

12048 Ryngler Rd

Built 1989 · 3,822 sq ft
LOT 6,500 SQ FT · 1 STRUCTURE · APN 2369-019-028Lot Structure
1 item worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1989
Living area
3,822 sqft
Lot size
6,500 sqft
Structures on lot
1
Bedrooms
5
Bathrooms
4
Home type
Single-family
Parcel (APN)
2369-019-028

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

1 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterOn record 2020
Expected 2030 to 2035From the 2020 permit
20262035

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2026
    permit on file, unconfirmedGeneral remodel: 1 Door(S). Window And Door Change-Out (Same Size & Type) For Residential Buildings. Dual Glazing, Labeled And Certified By National Fenestration Rating Council (Nfrc), Is Required For Doors And Windows Replaced In All Residential Buildings, Three Stories Or Less, Per Title 24, Part 6, Section 150.2(
  • 2026
    permit on file, unconfirmedSolar: (Eplan) Plan Check For Installation Of Energy Storage System. Scope Of Work Includes 2 Energy Storage Systems, 1 Gateway 3, 1 Back Up Panel, And Connected To Existing Main Service Panel. Installation Of An Energy Storage Unit. (2) Tesla: Powerwall 3 1707000-Xx-Y, 13.5Kwh, Lithium Ion Battery Located
  • 2026
    permit on fileElectrical: Main Panel Replacement: Existing 200 Amp Mainpanel With 175 Amp Main Breaker To Be Replaced Withnew 200 Amp Main Panel With 200 Amp Main Breakerwith 225 Amp Main Bus. New 225A Backup Loads Panel With 175A Main Breaker To Be Install
  • 2021
    permit on file, unconfirmedSolar: (E-Plan)New Installation To A 200 Amp Msp And Existing Pv System. Scope Of Work Includes 2 Energy Storage Systems And 2 Panels Of 200 Amps.*Note: Main Panel Upgrades To Pulled Under A Separate Permit. Solar Pv Installation Shall Comply With Los Angeles Fire Department'S Fire Prevention Bureau (Fpb)
  • 2020
    permit on fileWater heater: Replace Water Heater Same Location
  • 2015
    permit on file, unconfirmedElectrical: Electrical Permit · SOLARCITY CORPORATION
  • 2015
    permit on filePlumbing: Plumbing Permit · F W H ACQUISITION CO LLC
  • 2015
    permit on file, unconfirmedSolar: Pv1. Addition To An Existing System. System Total Size; 9Kw · SOLARCITY CORPORATION

Manage this home to schedule a service or to update the timeline.

Coming up
  • 2030
    Water heater replacementExpected 2030 to 2035