LAHomework Sign in
Northridge, CA 91326 · Ricasoli Way

12015 Ricasoli Way

Built 2016 · 3,748 sq ft
LOT 6,692 SQ FT · APN 2701-084-007Lot Structure
2 items worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
2016
Living area
3,748 sqft
Lot size
6,692 sqft
Bedrooms
5
Bathrooms
6
Home type
Single-family
Parcel (APN)
2701-084-007

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

2 worth planning for · 0 to confirm. Open "How we estimate this" on any card.
HVACComing up
Expected 2031 to 2036From build year 2016
20262035
Water heaterWorth a look now
Expected 2026 to 2031From build year 2016
20262035
See 1 more system expected later
RoofLater
Expected 2036 to 2046Original, built 2016

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 76 homes on Ricasoli Way →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2025
    permit on fileElectrical: E-Plan, Installation Of 3 X Tesla Powerwall 3 Batteries (Total 40.5 Kw).
  • 2024
    permit on fileSolar: Installation Of A Roof-Mounted Microinverter/Ac Module Solar Photovoltaic (Pv) System, Not Exceeding 38.4Kw In A 1 Or 2 Family Dwelling.
  • 2024
    permit on fileElectrical: Main Breaker Downsize To 175A
  • 2017
    permit on file, unconfirmedPool: 16' X 32' Pool With 7' X 7' Spa Per City Standard Plan #270 · ALL OUTDOOR G O CONSTRUCTION INC

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Water heater replacementExpected 2026 to 2031
  • 2031
    HVAC replacementExpected 2031 to 2036