LAHomework Sign in
Los Angeles, CA 90037 · W 38th St

1200 W 38th St

Built 1905 · 1,584 sq ft
LOT 5,203 SQ FT · 2 STRUCTURES · APN 5037-012-010Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1905
Living area
1,584 sqft
Lot size
5,203 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
3
Bathrooms
2
Home type
Single-family
Parcel (APN)
5037-012-010

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofOn record 2016
Expected 2036 to 2046From the 2016 permit
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 64 homes on W 38th St →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2025
    permit on fileSolar: Installation Of A Roof-Mounted Microinverter/Ac Module Solar Photovoltaic (Pv) System, Not Exceeding 38.4Kw In A 1 Or 2 Family Dwelling.
  • 2025
    permit on fileSolar: [E-Plan] New Pv1 Roof Mounted Solar System Comsisting O 6 Modules-Microinverters. System Size Is 2.4Kwdc/1.74Kwac
  • 2025
    permit on fileSolar: Note To Plan Checker: Project Address Should Be The Same As Project Name But It Doesnt Show In The Drop Down List. This Application Requires A Project Address In Order To Proceed.Installation Of A Roof-Mounted Microinverter/Ac Module Solar Photovoltaic (Pv)System 2.4Kw Dc/1.4 Kw Ac (6) Modules With
  • 2025
    permit on fileSolar: [Eplan] New Roof Mounted Solar Pv1 System With 6 Modules/Microinverters. 2.4Kwdc / 1.7Kwac.
  • 2016
    permit on fileRoof: Reroof With 36 Sqrs Comp Shingle Roofing Over New Solid Sheathing. Re- · VERA'S GENERAL BUILDING
  • 2015
    permit on file, unconfirmedHeating & cooling: Hvac Permit · DANGOUR OREN

Manage this home to schedule a service or to update the timeline.