LAHomework Sign in
Los Angeles, CA 91605 · Ratner St

11920 Ratner St

Built 1950 · 1,673 sq ft
LOT 9,890 SQ FT · 2 STRUCTURES · APN 2310-014-018Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1950
Living area
1,673 sqft
Lot size
9,890 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
3
Bathrooms
1
Home type
Single-family
Parcel (APN)
2310-014-018

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 3 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 94 homes on Ratner St →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2026
    permit on file, unconfirmedElectrical: Upgrading Panel Box To 200 Amp
  • 2026
    permit on filePlumbing: Upgrading Main Water Line From 3/4" To 1".
  • 2025
    permit on file, unconfirmedRoom addition: 9'-0" X 35'-11.5" Addition And Major Remodel To Existing Single Story Single Family Dwelling*Nfpa-13D Fire Sprinklered Throughout
  • 2025
    permit on file, unconfirmedPool: Pool Remodel And To Add Spa Inside (E) Pool Per Standard #268 And Additional Engieering Details
  • 2025
    permit on fileElectrical: Installing Temporary Power Pole 100Amp 120/240V One Phase 4 Clip Overhead Meter

Manage this home to schedule a service or to update the timeline.