LAHomework Sign in
Whittier, CA 90604 · Groveland Ave

11905 Groveland Ave

Built 1960 · 1,419 sq ft
LOT 9,258 SQ FT · 1 STRUCTURE · APN 8035-009-001Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1960
Living area
1,419 sqft
Lot size
9,258 sqft
Structures on lot
1
Bedrooms
4
Bathrooms
2
Home type
Single-family
Parcel (APN)
8035-009-001

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 3 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 88 homes on Groveland Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2022
    permit on file, unconfirmedSolar: Roof Mounted Pv Solar, 24 Panels, 8.5 Kw (Unc-Elec220214001210)
  • 2022
    permit on file, unconfirmedElectrical: • Main Panel Replacement: Existing 125 Amp Main Panel With 125 Amp Main Breaker To Be Replaced With New 225 Amp Main Panel With 200 Amp Main Breaker. (Ref. Solr220214000615)
  • 2022
    permit on fileSolar: To Install A 9.480Kw Rooftop Mount Pv System With 24 Panels
  • 2022
    permit on fileSolar: 225A Panel Upgrade On A Solar System *** Warning! Conductors Shall Not Exit The Back Of Any Surface Mounted Electrical Equipment; *** For Exterior Semi-Flush Mounted Electrical Equipment: Lath/Plaster Shall Not Be Installed Prior To Initial Inspection; *** For Exterior Surface Mounted Electrical Equ
  • 2019
    permit on file, unconfirmedSolar: 6.51 Kw 21 Panel Roof Mounted Pv System

Manage this home to schedule a service or to update the timeline.