LAHomework Sign in
Pasadena, CA 91104 · N Wilson Ave

1189 N Wilson Ave

Built 1910 · 1,654 sq ft
LOT 8,655 SQ FT · 2 STRUCTURES · APN 5740-010-025Lot Structure
0 items worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1910
Living area
1,654 sqft
Lot size
8,655 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
3
Bathrooms
2
Home type
Single-family
Parcel (APN)
5740-010-025

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 0 to confirm. Open "How we estimate this" on any card.
RoofOn record 2016
Expected 2036 to 2046From the 2016 permit
HVACOn record 2022
Expected 2037 to 2042From the 2022 permit
Water heaterOn record 2023
Expected 2033 to 2038From the 2023 permit
20262035

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 135 homes on N Wilson Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2024
    permit on fileElectrical: Express Permit. Installation Of A New 30 Amp, 240 Volt Electrical Circuit With 30 Amp Fused Disconnect. Includes A New 3O Amp Breaker At The Main Panel. Includes An Additional Miscellaneous 20 Amp - 120 Volt Circuit.
  • 2023
    permit on fileWater heater: (1) 50 Gallon Water Heater Changeout, In Basement Like For Like
  • 2022
    permit on fileHeating & cooling: Express Permit. Install Heat Pump System
  • 2018
    permit on fileElectrical: Electrical For Ev Charger
  • 2016
    permit on fileRoof: Tear Off Existing Roofing/Install New Asphalt Shingles With 1 Layer 30# Felt (Verify Smoke & Co Alarms) (No Alterations To Eaves)
  • 2016
    permit on filePlumbing: Changing Location Of Gas Line In Ktchen
  • 2012
    permit on fileRoof: Replace Existing Siding @ Garage With Redwood Siding, Replace Slider Window With Wood Casement Window
  • 2012
    permit on fileElectrical: Install (1) Electrical Fixture For Garage
  • 2009
    permit on fileElectrical: Install Electrical Fixtures
  • 2009
    permit on fileRoof: Re-Roof Garage Comp. Shingles
  • 2009
    permit on fileSolar: Install Solra System On Roof Of Residence
  • 2009
    permit on fileGeneral remodel: The Construction Of A New Shade Structure Over An Exisitng Concrete Patio In The Rear Yard. Patio Is Located Adjacent To (E) Sfr
  • 2009
    permit on fileElectrical: Install House Sub-Panel/Undergroun Line To Sub-Panel In Detached Garage - Install Fixtures On Garage
  • 2009
    permit on file, unconfirmedGeneral remodel: Historic Building Diagram
  • 2003
    permit on fileGeneral remodel: Install Awning For 3 Windows On 2Nd Floor East Side
  • 1998
    permit on fileElectrical: Rewire Kitchen + Laundry Rm And Provide Additional J-Box
  • 1998
    permit on fileElectrical: Install Elect. For Hvac
  • 1998
    permit on fileHeating & cooling: Adding Air Conditioning Unit
  • 1998
    permit on fileElectrical: Upgrade Existing Electrical Service
  • 1997
    permit on filePlumbing: Repipe
  • 1997
    permit on file, unconfirmedPlumbing: Plumbing For Laundryrm Remodel + Relocate Water- Heater (Interior)
  • 1997
    permit on fileGeneral remodel: Replacement Of 70'S Windows W/Wooden Double-Hung Windows Which Match The Rest Of The House - Rear W Wall Of House + Also Jacking Of S/W Corner To Level) (No Plans)
  • 1992
    permit on fileGeneral remodel: Se - Foundation Anchorage Retrofit

Manage this home to schedule a service or to update the timeline.