LAHomework Sign in
Chatsworth, CA 91311 · Poema Pl

11812 Poema Pl

Built 1988 · 7,032 sq ft
LOT 43,531 SQ FT · 1 STRUCTURE · APN 2821-025-002Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1988
Living area
7,032 sqft
Lot size
43,531 sqft
Structures on lot
1
Bedrooms
7
Bathrooms
8
Home type
Single-family
Parcel (APN)
2821-025-002

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofOn record 2020
Expected 2040 to 2050From the 2020 permit
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 22 homes on Poema Pl →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2020
    permit on fileRoof: Remove (E) Clay Roofing Down To Sheeting, Apply 2 Layers Of 40Lb Udl, Install 6400Sq Ft Flat Concrete Tile (Boral Saxony Bronze Pearl Blend Ers167 Crrc0187-0942), Install 800Sq Ft Single Play Of Coolster Torch Down Cap Sheet (White Crrc0668-0081) At Flat Portions House And Attached Garage.
  • 2019
    permit on fileKitchen: 81 Sq.Ft. 1St Story Addition & 580 Sq.Ft. Interior Remodel At Kitchen And Powder Room, 338 Sq.Ft. 2Nd Story Addition In (E) 2-Story Volume For New Master Bedroom, Remodel 446 Sq.Ft. For New Master Closet And Powder Room, Remove And Replace Existing Staircase, Remove And Replace 15 Windows Like For L
  • 2019
    permit on fileElectrical: Electrical For Addition And Interior Remodel. Replace Main 400 Amp Panel And (3) 200 Amp Sub Panels.
  • 2019
    permit on filePlumbing: Plumbing For Interior Remodel And Addition

Manage this home to schedule a service or to update the timeline.