LAHomework Sign in
El Monte, CA 91732 · Mcgirk Ave

11812 Mcgirk Ave

Built 1947 · 1,420 sq ft
LOT 5,136 SQ FT · 1 STRUCTURE · APN 8548-006-012Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1947
Living area
1,420 sqft
Lot size
5,136 sqft
Structures on lot
1
Bedrooms
3
Bathrooms
2
Home type
Single-family
Parcel (APN)
8548-006-012

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 3 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 122 homes on Mcgirk Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2025
    permit on fileSolar: Installation Of New Roof Mounted Pv Solar System: 12.6 Kw, 30 Modules, 1 Tesla Powerwall Ess. No Electrical Main Panel Upgrade.
  • 2025
    permit on fileSolar: Remove (E ) Shingles And Replace With (N) Asphalt Shingles ( Must Compy With La County Green Building Code Requirements Cgbsc 4.106.6, Field To Verify) Plywood Replacement As Needed. House And Attached Garage . Approx 27 Squares. (E) Pv Pannels Will Be Removed, Not Reinstalled. "The Issuance Of This
  • 2024
    permit on fileBathrooms: Re: Legalize Installation Of Receptacles And Switches Throughout. Main Electrical Panel Upgrade To 200 Amps And Relocation. Legalize Water Heater Changeout. Legalize Retrofit Window Changeout (10 Total) And (1) Sliding Glass Door. Legalize Bathtub Change Out In Bathroom.
  • 2010
    permit on fileSolar: Install Roof Mounted Photovoltaic System 8 Panels With (1) Inverter

Manage this home to schedule a service or to update the timeline.