LAHomework Sign in
Los Angeles, CA 91604 · Sunshine Ter

11800 Sunshine Ter

Built 2010 · 3,713 sq ft
LOT 4,966 SQ FT · 1 STRUCTURE · APN 2377-002-007Lot Structure
3 items worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
2010
Living area
3,713 sqft
Lot size
4,966 sqft
Structures on lot
1
Bedrooms
4
Bathrooms
4
Home type
Single-family
Parcel (APN)
2377-002-007

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

3 worth planning for · 0 to confirm. Open "How we estimate this" on any card.
RoofComing up
Expected 2030 to 2040From build year 2010
20262035
HVACWorth a look now
Expected 2025 to 2030From build year 2010
20262035
Water heaterWorth a look now
Usually done by 2025From build year 2010

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 173 homes on Sunshine Ter →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2023
    permit on file, unconfirmedRoof: Re-Roof With Class A Or B Roof Covering Material Weighing Less Than 6 Pounds Per Sq. Ft. Over Existing Solid Sheathing 30 Squares. Class A Roof Covering Is Required Within Very High Fire Hazard Severity Zone (Vhfhsz). For Residential Roof Replacement > 50% Of The Total Roof Area, Apply Cool Roof Pro
  • 2021
    permit on fileRoom addition: Remove (E) Balcony At 2Nd Floor And Replace With 6'-8" X 6'7" (N) Elevator Shaft, And (N) Door All Work Per Engineering

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Water heater replacementUsually done by 2025
  • Now
    HVAC replacementExpected 2025 to 2030
  • 2030
    Roof replacementExpected 2030 to 2040