LAHomework Sign in
Los Angeles, CA 90059 · Holmes Ave

11800 Holmes Ave

Built 1945 · 798 sq ft
LOT 3,992 SQ FT · APN 6149-017-940Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1945
Living area
798 sqft
Lot size
3,992 sqft
Bedrooms
2
Bathrooms
1
Home type
Single-family
Parcel (APN)
6149-017-940

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 3 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 18 homes on Holmes Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2026
    permit on file, unconfirmedElectrical: Martin Luther King North Parking Structure - Temporary Power Application For Martin Luther King North Parking Structure On 11826 Holmes Avenue. Temp Power Will Run Through An (E) Meter With A 200 A Panel Added To It.
  • 2026
    permit on file, unconfirmedSolar: The Martin Luther King North Parking Structure - Provide Electrical Design-Build For 301 Stalls, 4-Level Parking Structure. A. Provide New Lighting And Power Distribution System To New Parking Structure. B. Provide Power/Conduit To Convenience Outlets, New Electric Vehicle Charging Stations, Hvac Un
  • 2026
    permit on file, unconfirmedHeating & cooling: The Martin Luther King North Parking Structure Is Designed As A Long-Span Cast-In-Place Concrete, Post Tensioned Slab And Beam Systems With Slab On Grade And Three Elevated Levels For A Total Of Four Levels. The Lateral Resisting Structural System Is Achieved By Using Moment-Resisting Frames In The
  • 2026
    permit on file, unconfirmedPlumbing: The Martin Luther King North Parking Structure Is Designed As A Long-Span Cast-In-Place Concrete, Post Tensioned Slab And Beam Systems With Slab On Grade And Three Elevated Levels For A Total Of Four Levels. The Lateral Resisting Structural System Is Achieved By Using Moment-Resisting Frames In The

Manage this home to schedule a service or to update the timeline.