LAHomework Sign in
Los Angeles, CA 91340 · Glencrest Dr

11757 Glencrest Dr

Built 1956 · 2,128 sq ft
LOT 7,345 SQ FT · 1 STRUCTURE · APN 2524-002-018Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1956
Living area
2,128 sqft
Lot size
7,345 sqft
Structures on lot
1
Bedrooms
4
Bathrooms
3
Home type
Single-family
Parcel (APN)
2524-002-018

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 3 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 21 homes on Glencrest Dr →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2024
    permit on file, unconfirmedRoom addition: Convert 17'-6" X 28'-0" Portion Of Existing Single-Family Dwelling To New Junior Accessory Dwelling Unit Per Gcs 65852.2(E)(1)(A) And 65852.22 & New 17'-6" X 9'-11" Addition To Existing Single-Family Dwelling To Create New Bedroom. "Comply With Department Order Effective Date 11/15/2022. Permit Will
  • 2021
    permit on file, unconfirmedSolar: New Pv1 Roof-Mounted Installation For A 200 Amp Msp. Scope Of Work Includes 10 Modules, 10 Optimizers, And 1 Central Inverter.System Size: 4 Kw Dc; 5 Kw Acsolar Pv Installation Shall Comply With Los Angeles Fire Department'S Fire Prevention Bureau (Fpb) Requirement No. 96
  • 2021
    permit on fileElectrical: Mpu To 200A
  • 2021
    permit on fileSolar: (E-Plan)New Pv1 Roof-Mounted Installation. Scope Of Work Includes 10 Modules, 10 Optimizers, And 1 Central Inverter. System Size: 3.5 Kw Dc; 5 Kw Ac*Note: Main Panel Upgrade Shall Be Pulled Under A Separate Permit.

Manage this home to schedule a service or to update the timeline.