LAHomework Sign in
Pasadena, CA 91104 · N Holliston Ave

1167 N Holliston Ave

Built 1924 · 2,268 sq ft
LOT 10,280 SQ FT · 2 STRUCTURES · APN 5741-015-018Lot Structure
1 item worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1924
Living area
2,268 sqft
Lot size
10,280 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
4
Bathrooms
2
Home type
Single-family
Parcel (APN)
5741-015-018

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

1 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofOn record 1999
Expected 2019 to 2029From the 1999 permit
20262035
HVACOn record 2025
Expected 2040 to 2045From the 2025 permit
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 194 homes on N Holliston Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2025
    permit on filePlumbing: Plumbing Permit For Online Adu: Convert Existing 366 Sq/Ft Detached Garage Into Adu.
  • 2025
    permit on fileRoom addition: Online Adu: Convert Existing 366 Sq/Ft Detached Garage Into Adu.
  • 2025
    permit on fileElectrical: Upgrade Electrical Service To 200 Amp. 100 Amp To Feed New Adu
  • 2025
    permit on fileElectrical: Electrical Permit For Online Adu: Convert Existing 366 Sq/Ft Detached Garage Into Adu.
  • 2025
    permit on fileHeating & cooling: Mechanical Permit For Online Adu: Convert Existing 366 Sq/Ft Detached Garage Into Adu.
  • 2023
    permit on fileHeating & cooling: Express Permit. Replacing The Old Hvac System With Daikin 5 Ton Split Heat Pump.
  • 2009
    permit on file, unconfirmedGeneral remodel: Historic Building Diagram
  • 2002
    permit on fileGeneral remodel: Repair Exist Chimney From Throat Up Per City Standard (@ Front)
  • 2002
    permit on filePlumbing: Install Plumbing Fixtures For Bath Add
  • 2002
    permit on fileElectrical: Install Electrical Fixtures For Addition
  • 2002
    permit on fileHeating & cooling: Install Heating & Air For Addition
  • 2002
    permit on fileBathrooms: Resid. Rm. Addn. Master Bedroom Bath Walk In Closet And Addn. To Exist. Bedroom
  • 1999
    permit on fileRoof: Re Roof Residence W/Class A Comp
  • 1995
    permit on fileGeneral remodel: Bolt Perimeter Mud Sill To Footing
  • 1993
    permit on file, unconfirmedWater heater: Pl - Water Heater Replacement
  • 1990
    permit on fileKitchen: Bu - Resid. Kitchen Remodel Cabinets + Non Bearing Walls
  • 1990
    permit on filePlumbing: Pl - Resid. Kitchen Remodel Cabinets + Non Bearing Walls
  • 1990
    permit on fileHeating & cooling: Me - Resid. Kitchen Remodel Cabinets + Non Bearing Walls
  • 1990
    permit on fileElectrical: El - Resid. Kitchen Remodel Cabinets + Non Bearing Walls

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Roof replacementExpected 2019 to 2029