LAHomework Sign in
Glendale, CA 91201 · Raymond Ave

1165 Raymond Ave

Built 1922 · 1,332 sq ft
LOT 6,602 SQ FT · 3 STRUCTURES · APN 5623-018-020Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1922
Living area
1,332 sqft
Lot size
6,602 sqft
Structures on lot
3 main home plus another structure: a garage, guest house or ADU
Bedrooms
3
Bathrooms
2
Home type
Duplex (2 units)
Parcel (APN)
5623-018-020

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofOn record 2019
Expected 2039 to 2049From the 2019 permit
HVACOn record 2019
Expected 2034 to 2039From the 2019 permit
20262035
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 224 homes on Raymond Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2019
    permit on fileHeating & cooling: 2 Fau Up To 100000Btu, 1 Up To 3Hp Motor
  • 2019
    permit on fileRoof: Re-Demolition, Re-Electrical (Replace), Re Ceiling Joist/Roof Rafter, Due To Temites, Reroute Plumbing Because Of Addition. Replace 7 Windows. Replace Kitchen Cabinets. Legalization
  • 2003
    permit on fileRoof: Material:Class A - No. Of Squares:1400 - Tear Of Existing (Y/N):Y - Existing No. Of Layers:3 - New Sheathing (Y/N):Y - Note: All Tear-Offs Require Solid Sheathing. Install Min. 3/8" Structural Wood Panel With 6D Common Nails At 6:12. This May Be Installed Over Existing Spaced Sheathing. -

Manage this home to schedule a service or to update the timeline.