LAHomework Sign in
Northridge, CA 91326 · Sassari Ln

11536 Sassari Ln

Built 2005 · 2,655 sq ft
LOT 6,074 SQ FT · 1 STRUCTURE · APN 2701-070-013Lot Structure
2 items worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
2005
Living area
2,655 sqft
Lot size
6,074 sqft
Structures on lot
1
Bedrooms
4
Bathrooms
3
Home type
Single-family
Parcel (APN)
2701-070-013

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

2 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofWorth a look now
Expected 2025 to 2035From build year 2005
20262035
HVACWorth a look now
Usually done by 2025From build year 2005
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 14 homes on Sassari Ln →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2024
    permit on fileElectrical: Ev Charger
  • 2020
    permit on file, unconfirmedSolar: 9.720 Solar Permit
  • 2020
    permit on file, unconfirmedElectrical: 200 Amps Bracket Rated To 175Amps
  • 2020
    permit on fileSolar: $0.00 Permit Fees Due To Ab1414.[Eplan[] Pv1 Roof Mounted System. Scope Of Work Includes: (24) Modules With Microinverters, And (1) Combiner Box That Is Connected To An Existing 200A Msp. System Size: 9.27Kw Dc.

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    HVAC replacementUsually done by 2025
  • Now
    Roof replacementExpected 2025 to 2035