LAHomework Sign in
Los Angeles, CA 90044 · Berendo Ave

11507 Berendo Ave

Built 1953 · 1,574 sq ft
LOT 8,823 SQ FT · 1 STRUCTURE · APN 6079-019-042Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1953
Living area
1,574 sqft
Lot size
8,823 sqft
Structures on lot
1
Bedrooms
4
Bathrooms
4
Home type
Single-family
Parcel (APN)
6079-019-042

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACOn record 2024
Expected 2039 to 2044From the 2024 permit
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 111 homes on Berendo Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2024
    permit on fileRoom addition: 431 Sf Garage Conversion To Accessory Dwelling Unit (Adu) With Studio Layout, 3/4 Bath. Per Garage-To-Adu Standard Plan. Methane Mitigation Required Per Approved Methane Plan.
  • 2024
    permit on file, unconfirmedElectrical: Methane Zone. 431 Sf Garage Conversion To Accessory Dwelling Unit (Adu) With Studio Layout, 3/4 Bath. Per Garage-To-Adu Standard Plan.
  • 2024
    permit on fileHeating & cooling: 431 Sf Garage Conversion To Accessory Dwelling Unit (Adu) With Studio Layout, 3/4 Bath. Per Garage-To-Adu Standard Plan. Methane Mitigation Required Per Approved Methane Plan.
  • 2024
    permit on filePlumbing: 431 Sf Garage Conversion To Accessory Dwelling Unit (Adu) With Studio Layout, 3/4 Bath. Per Garage-To-Adu Standard Plan. Methane Mitigation Required Per Approved Methane Plan.
  • 2024
    permit on filePlumbing: 431 Sf Garage Conversion To Accessory Dwelling Unit (Adu) With Studio Layout, 3/4 Bath. Per Garage-To-Adu Standard Plan. Methane Mitigation Required Per Approved Methane Plan.
  • 2022
    permit on fileHeating & cooling: Replacing Hvac Of 4T 80K Upflow Furnace Like For Like, Same Location, Replacing Existing Ductwork.
  • 2020
    permit on fileBathrooms: Conversion Of (E) Floor Area In (E) Dwelling To Add New Bedroom- Remodel (E) Bathroom, Relocate (E) Bathroom, Modify (E) Closets In (E) Bedrooms And Add New Laundry Room And Closet
  • 2020
    permit on filePlumbing: Conversion Of (E) Floor Area In (E) Dwelling To Add New Bedroom- Remodel (E) Bathroom, Relocate (E) Bathroom, Modify (E) Closets In (E) Bedrooms And Add New Laundry Room And Closet
  • 2020
    permit on fileElectrical: Conversion Of (E) Floor Area In (E) Dwelling To Add New Bedroom- Remodel (E) Bathroom, Relocate (E) Bathroom, Modify (E) Closets In (E) Bedrooms And Add New Laundry Room And Closet.
  • 2020
    permit on fileHeating & cooling: Conversion Of (E) Floor Area In (E) Dwelling To Add New Bedroom- Remodel (E) Bathroom, Relocate (E) Bathroom, Modify (E) Closets In (E) Bedrooms And Add New Laundry Room And Closet

Manage this home to schedule a service or to update the timeline.