LAHomework Sign in
Los Angeles, CA 90047 · Ruthelen St

11502 Ruthelen St

Built 1950 · 1,295 sq ft
LOT 5,371 SQ FT · 1 STRUCTURE · APN 4057-019-012Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1950
Living area
1,295 sqft
Lot size
5,371 sqft
Structures on lot
1
Bedrooms
2
Bathrooms
2
Home type
Single-family
Parcel (APN)
4057-019-012

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofOn record 2022
Expected 2042 to 2052From the 2022 permit
HVACOn record 2026
Expected 2041 to 2046From the 2026 permit
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 256 homes on Ruthelen St →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2026
    permit on fileHeating & cooling: 3 Ton Condenser Change Out In Back Yard, 3 Ton Indoor Coil Change Out, 50K Btu Furnace Change Out In Attic
  • 2022
    permit on fileGeneral remodel: Replacing 18 Windows With No Change To Size Or Location
  • 2022
    permit on fileRoof: T/O And Re-Roof House Structure With Garage. Install Plywood, Install Sheating. Crrc 0890-0017 Mojave And 8 Squares Crrc-0668-0008 Torch Down
  • 2022
    permit on fileSolar: Install (14) Roof Mounted Pv Modules And (14) Enphase Micro Inverters. Upgrade Main Service Panel From 100A To 200A
  • 2022
    permit on fileElectrical: Related To: Unc-Solr220722004080 Main Panel Upgrade To A 200A Main Panel Occurring Here.

Manage this home to schedule a service or to update the timeline.