LAHomework Sign in
Pacoima, CA 91331 · Freedom Ln

11418 Freedom Ln

Built 2012 · 1,575 sq ft
LOT 2,355 SQ FT · 1 STRUCTURE · APN 2532-032-057Lot Structure
2 items worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
2012
Living area
1,575 sqft
Lot size
2,355 sqft
Structures on lot
1
Bedrooms
4
Bathrooms
3
Home type
Single-family
Parcel (APN)
2532-032-057

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

2 worth planning for · 0 to confirm. Open "How we estimate this" on any card.
HVACComing up
Expected 2027 to 2032From build year 2012
20262035
Water heaterWorth a look now
Expected 2022 to 2027From build year 2012
20262035
See 1 more system expected later
RoofLater
Expected 2032 to 2042Original, built 2012
20262035

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 10 homes on Freedom Ln →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2026
    permit on file, unconfirmedSolar: (Eplan) New Rooftop Solar Installation 4.5 Kw, (10) Modules, (1) Inverter. 225 A Main Panel Upgrade (Mpu).
  • 2026
    permit on file, unconfirmedElectrical: 225/200A Panel Upgrade W. 200A Main Breaker
  • 2026
    permit on file, unconfirmedSolar: Existing Solar System Installed, Main Panel Replacement: Existing 100 Amp Main Panel With 100 Amp Main Breaker To Be Replaced With New 200 Amp Main Panel With 200 Amp Main Breaker With 225A Busbar.

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Water heater replacementExpected 2022 to 2027
  • 2027
    HVAC replacementExpected 2027 to 2032