LAHomework Sign in
Los Angeles, CA 91342 · Jeff Ave

11308 Jeff Ave

Built 1963 · 2,234 sq ft
LOT 10,891 SQ FT · 1 STRUCTURE · APN 2529-014-005Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1963
Living area
2,234 sqft
Lot size
10,891 sqft
Structures on lot
1
Bedrooms
3
Bathrooms
3
Home type
Single-family
Parcel (APN)
2529-014-005

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACOn record 2024
Expected 2039 to 2044From the 2024 permit
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 35 homes on Jeff Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2025
    permit on fileSolar: Pv1, Pv System Roof Mount:12 Xmodules Of 450 W, Total: 5.4 Kwdc3 X Uinverter Of 1350 W, Total: 4.05 Kwac1Xstring1X100A Panel
  • 2024
    permit on fileElectrical: 200A Main Service Panel With Main Breaker Downsized To 175A
  • 2024
    permit on fileSolar: Rood Mounted ,17 Modules, 7.65 Kw Dc Size, 5 Microinverters, 1Xtesla Powerwall 2, Backup Gateway, 125A Pv Combiner Box, 125A Service Sub Panel, 60A Ac Disconnect.
  • 2024
    permit on fileElectrical: [Eplan] Power Plan Check For Additional Battery 13.5 Kwh 1 - Tesla Powerwall 21 - Ac Disconnect1 - Service Sub Panel
  • 2024
    permit on fileElectrical: (N) 225A Smart Main Panel
  • 2024
    permit on fileHeating & cooling: Replace Air Handler, Condenser And Ducting (1) 4 Ton Bosch Air Handler System And Condenser

Manage this home to schedule a service or to update the timeline.