LAHomework Sign in
Glendale, CA 91207 · Campbell St

1130 Campbell St Unit 112

Built 2010 · 1,560 sq ft
SHARED CONDO LOT · APN 5647-015-151Lot Structure
3 items worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
2010
Living area
1,560 sqft
Lot
Shared (condo complex)
Bedrooms
2
Bathrooms
3
Home type
Condo / townhome
Parcel (APN)
5647-015-151

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

3 worth planning for · 0 to confirm. Open "How we estimate this" on any card.
RoofComing up
Expected 2030 to 2040From build year 2010
20262035
HVACWorth a look now
Expected 2025 to 2030From build year 2010
20262035
Water heaterWorth a look now
Usually done by 2025From build year 2010

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 174 homes on Campbell St →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2010
    permit on filePlumbing: 1 Backflow Device
  • 2009
    permit on fileHeating & cooling: 12 Prefabricated Fire Places
  • 2009
    permit on fileHeating & cooling: (12) Appliance Vents, (24) Air Handling Units, (48) Single Duct Vent Fans, 1 Garage Exhaust
  • 2009
    permit on fileRoof: Request: To Allow The Installation Of Abs Pipe In Lieu Of Cast Iron Pipe As Requ-D By Cpc. - - Justification:1. Units Are Not Stacked, 2. Each Multi Level Residential Unit Is Separated From Surrounding Units By A 1Hr Demising Wall, 3. No "Vent" Piping Will Be Originated From 3Rd Level, 4. The Total
  • 2009
    permit on fileElectrical: 12 Alternative Per Unit Charge Mfd, 25 Branch Circuit, 2 2001-600 Amp Service, 1 Distribution Panel 30 Spaces, And 3 Motors -
  • 2009
    permit on filePlumbing: 194 Fixtures, One Backflow, 26 Misc(2 Backwater Valves, 12 Expansion Tanks, 12 Recirc. Pumps) - 36 Low Pressure Gas System., 1 Building Sewer, One Sewer Connection 146 Rainwater System, For Each Drain Inside The Building, 2 Sump Pump
  • 2009
    permit on filePlumbing: Seven Drains
  • 2009
    permit on fileElectrical: 1 Temporary Service
  • 2009
    permit on fileGeneral remodel: Demo N"E- Sfd (2 Bedrooms), Garage & 1 Guest House - Ref. Bb20081255
  • 2008
    permit on fileGeneral remodel: New 12 Unit Apt Dwelling Over One Level Basement & Parking -W- 34 Stalls And 1- Elevator

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Water heater replacementUsually done by 2025
  • Now
    HVAC replacementExpected 2025 to 2030
  • 2030
    Roof replacementExpected 2030 to 2040