LAHomework Sign in
Los Angeles, CA 91344 · Dempsey Ave

11255 Dempsey Ave

Built 1956 · 3,554 sq ft
LOT 8,100 SQ FT · 2 STRUCTURES · APN 2666-026-011Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1956
Living area
3,554 sqft
Lot size
8,100 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
6
Bathrooms
5
Home type
Single-family
Parcel (APN)
2666-026-011

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 3 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 124 homes on Dempsey Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2026
    permit on file, unconfirmedElectrical: Temporary Power Pole 100 Amp"Comply With Department Order Effective Date05/14/2025. Permit Will Expire 30 Days From Issuance Date".
  • 2025
    permit on file, unconfirmedGeneral remodel: Fire Damage Repair For Residential Building Only (Maximum 10% Of Replacement Cost Of Building). "Comply With Department Order Effective Date 05/14/2025. Permit Will Expire 30 Days From Issuance Date".
  • 2025
    permit on file, unconfirmedRoom addition: Eplan Addition To Existing Garage To Make New 800 S.F. Detached Adu Per State Law(Gc 66323(A)(2) )2 Of 2
  • 2025
    permit on file, unconfirmedRoof: Eplan Convert Portions Of Existing 2 Story Sfd To 2 Story Adu (1453 Sf) Per Lamc 12.22 A.33 (C) And (E) And Convert Portion Of First Floor To Jadu (500 Sf) Per Gc 66323(A)(1)And 66333 (No Area Added)Replace Sfd Fire Damaged Roof With New Roof Framing1 Of 2
  • 2025
    permit on fileElectrical: 100 Amp & Temp Power Pole"Comply With Department Order Effective Date05/14/2025. Permit Will Expire 30 Days From Issuance Date"
  • 2022
    permit on fileSolar: Installation Of Roof-Mounted Central/String Inverter Solar Pv System, Notexceeding A Total Ac Output Of 10 Kw, In A 1 Or 2 Family Dwelling

Manage this home to schedule a service or to update the timeline.